Products
Product Description
Product Features
• Excellent impact resistance
• Designed for harsh operating environments
• High operational reliability
• Ensures stable wind power generation
• Low-loss design
• Improves energy efficiency
• Outstanding weather resistance
• Suitable for various climate conditions
• Long service life
• Reduces maintenance costs
Technical Specifications
FAQ
Q1: What applications is the Wind Power Transformer designed for?
A: It is designed for onshore and offshore wind farms, wind turbine step-up systems, and renewable energy grid connection projects.
Q2: What voltage ratings are available?
A: The high-voltage side is available in 10kV, 20kV, and 35kV, while the low-voltage side is typically 0.69kV. Customized voltage ratings are also available.
Q3: What are the key advantages of the transformer?
A: It features low losses, high efficiency, excellent impact resistance, superior weather resistance, reliable performance, and low maintenance costs.
Q4: Can the transformer operate in harsh environments?
A: Yes. It is designed to withstand humidity, corrosion, dust, strong winds, and extreme temperatures, making it suitable for demanding outdoor conditions.
Q5: What cooling methods are available?
A: Depending on the transformer capacity, ONAN or ONAF cooling methods are available to ensure efficient heat dissipation and stable operation.
Q6: Is customization available?
A: Yes. Capacity, voltage rating, vector group, tap changer, installation method, and other specifications can be customized according to project requirements.
Q7: Which international standards does the product comply with?
A: The transformer is designed and manufactured in accordance with IEC 60076 and can also comply with other international standards upon request.
Q8: Why choose this Wind Power Transformer?
A: With high reliability, energy efficiency, long service life, excellent environmental adaptability, and easy maintenance, it is an ideal solution for wind power generation projects.
Launch Your High-Efficiency Anti-Seepage Solution
Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.
Related Products
Get a Quote
Regardless of whether you require general advice or specific support, we are happy to help you.
Send Us Your Inquiry Today

Jinshida Electric remains committed to contributing to global energy development through professional manufacturing and superior service.