Shared oil-immersed transformer
Supported voltage levels include 10kV, 11kV, 13.8kV, 20kV, 22kV, 33kV, and 35kV; the low-voltage side is 0.4kV by default but can be customized according to customer requirements.
The standard capacity range is 30kVA to 2500kVA; products with higher capacities can be provided based on project needs.
Products are manufactured in accordance with international and national standards such as IEC 60076 and GB 1094.
The standard configuration features all-copper windings, but customization with copper-aluminum or all-aluminum windings is also supported.
It utilizes the ONAN (Oil Natural Air Natural) cooling method, ensuring stable operation and excellent heat dissipation.
Customization of specific voltages, capacities, vector groups, and accessory configurations is supported based on customer requirements.
The product is suitable for both indoor and outdoor installation, with configurations adaptable to specific environmental conditions.
Under normal operating and maintenance conditions, the service life can exceed 25 years.
Shared dry-type transformer
They utilize an epoxy resin vacuum casting insulation process, offering excellent insulation performance.
No. Dry-type transformers operate without oil, resulting in minimal maintenance requirements.
Yes, both AN (natural air cooling) and AF (forced air cooling) modes are supported.
They are suitable for locations such as hospitals, schools, airports, subways, commercial buildings, and data centers.
The standard protection rating is IP20; configurations such as IP23 are also available.
Voltage ratings such as 10kV, 11kV, 20kV, 33kV, and 35kV are supported.
Yes, customization of parameters such as capacity, voltage, and vector group is supported.
The products comply with standards such as IEC 60076-11 and GB/T 10228.
Shared pad-mounted transformer
They feature a compact structure, a small footprint, easy installation, and a short construction period.
Yes, different types of transformers can be configured based on project requirements.
Yes, customization is available for high-voltage systems, low-voltage systems, capacity, enclosure materials, and more.
Yes, the products are designed specifically for outdoor environments and offer excellent protection performance.
They comply with standards such as IEC 62271 and GB/T 17467.
Depending on the model, the capacity ranges from 50 kVA to 1600 kVA.
Yes, mobile box-type substations are designed for rapid deployment and easy transportation.
They are widely used in photovoltaic power plants, wind power generation, and other new energy projects.
Get a Quote
Regardless of whether you require general advice or specific support, we are happy to help you.
Send Us Your Inquiry Today

Jinshida Electric remains committed to contributing to global energy development through professional manufacturing and superior service.