‹

Step-Up Transformer for Photovoltaic Power Stations

›

‹

›

Step-Up Transformer for Photovoltaic Power Stations
The Photovoltaic Step-up Transformer is specially designed for solar power generation systems to efficiently step up low-voltage output to the required grid connection voltage. Featuring low energy loss, high efficiency, excellent overload capability, and strong harmonic resistance, it ensures stable and reliable operation in demanding environments. It is widely used in utility-scale photovoltaic power stations, distributed solar energy systems, and renewable energy projects, providing an efficient and dependable solution for modern solar power applications.
WhatsApp : +86 15312233527
Email : felix@jsdpower.com
Phone : +86 15312233527
View Quote >

Product Description

Product Features


• High-efficiency design


• Minimized system energy loss


• Excellent harmonic resistance


• Suitable for renewable energy applications


• Stable and reliable operation


• Ensures long-term continuous performance


• Energy-saving and environmentally friendly


• Improves overall power generation efficiency


• Customizable solutions available


• Meets various project requirements

Technical Specifications

ItemSpecification
Product TypePhotovoltaic Step-up Transformer
ModelPV Step-up Transformer
Rated Capacity500kVA–5000kVA
High Voltage10kV / 20kV / 35kV
Low Voltage0.315kV / 0.4kV / 0.69kV
Frequency50Hz / 60Hz
PhaseThree Phase
Vector GroupDyn11 / Yyn0
Tap Changer±2×2.5% or ±5%
Cooling MethodONAN / ONAF
Winding Material100% Copper
InstallationOutdoor
StandardIEC 60076



FAQ

Q1: What is a PV Step-Up Transformer used for?

A: It is mainly used in utility-scale photovoltaic power plants, distributed solar projects, and grid-connected renewable energy systems to step up the inverter output voltage for grid connection.



Q2: What voltage ratings are available?

A: The high-voltage side is typically available in 10kV, 20kV, and 35kV, while the low-voltage side supports 0.315kV, 0.4kV, and 0.69kV. Custom voltages are also available.



Q3: What winding material is used?

A: The transformer features high-quality copper windings, providing low losses, low temperature rise, high overload capability, and reliable performance.



Q4: What are the main advantages of the PV Step-Up Transformer?

A: It offers high efficiency, low energy loss, excellent harmonic resistance, stable operation, environmental friendliness, and a long service life.



Q5: Can the transformer be customized?

A: Yes. Capacity, voltage rating, vector group, tap changer, cooling method, and other specifications can be customized to meet project requirements.



Q6: What cooling methods are available?

A: The transformer normally adopts ONAN or ONAF cooling, ensuring efficient heat dissipation and reliable long-term operation.



Q7: Which standards does the product comply with?

A: The transformer is designed and manufactured according to IEC 60076 and can also comply with other international standards upon request.



Q8: Why choose this PV Step-Up Transformer?

A: With high reliability, excellent efficiency, low maintenance requirements, and strong adaptability to renewable energy applications, it is an ideal solution for photovoltaic power plants.


Launch Your High-Efficiency Anti-Seepage Solution

Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.

WhatsApp

+86 15312233527
Send Inquiry

Related Products