logo
  • HOME

  • PRODUCTS

    Transformers
    • Oil-Immersed Transformers

    • Dry-Type Transformers

    • Compact Substations

    • Special Transformers

    Energy Storage Systems
    • Mobile Energy Storage Systems

    • Container Energy Storage Systems

    • Commercial & Industrial Energy Storage Systems

    • Residential Energy Storage Systems

    Generators
    • Silent Canopy Diesel Generator Sets

    • Open Type Diesel Generator Sets

  • ABOUT US

  • NEWS

  • FAQ

  • CONTACT


EnglishEnglish


русскийрусскийالعربيةالعربيةFrançaisFrançaisPortuguêsPortuguêsEspañolEspañol
Send Inquiry
  • scb10
    11kV Three-Phase Cast Resin Dry-Type Distribution Transformer
    Brand: JINSHIDA Series: SCB10-12 USES: Distribution transformer Country of origin: China Certification: ISO9001, CB, CE, KEMA
  • 微信图片_20260617105117_74_3
    11kV/0.4kV Oil-Immersed Power Distribution Transformer
    Brand: JINSHIDA Series: S-M USES: Distribution transformer Country of origin: China Certification: ISO9001, CB, CE, KEMA
  • KUANG
    Mining Flameproof Transformer
    Designed for mine power distribution, this oil-immersed transformer features a compact size, ease of transport into the mine, a rational structure, low losses, and excellent thermal conductivity. - Suitable for oil-immersed mine power transformers with capacities up to 1250 kVA and voltages up to 10 kV. This is a standard oil-immersed transformer without explosion-proof requirements, primarily serving as a power source for mine lighting or electric drive systems during distribution. - Proven high reliability through operation in over 50 countries and regions worldwide; key markets include Iran, Kazakhstan, Uzbekistan, Pakistan, Indonesia, and Chile. - Standards compliance: IEC 60076, GB 1094.1–2-1996, GB 1094.3,5-2003, GB/T 6451-2008, and GB 12173-2008.
  • wecom-temp-2265243-fc5a2491944cc848dd11069b636e497f
    Isolation and Rectifier Special Transformer
    The Isolation & Rectifier Transformer is specially designed for industrial rectification systems requiring electrical isolation and stable DC power output. It provides excellent insulation performance, high operational reliability, and outstanding voltage regulation. The transformer is widely used in metallurgy, electrolysis, electroplating, rail transit, chemical processing, and power electronic equipment. Customized designs are available to meet various voltage, capacity, and application requirements.

Jinshida Electric Power Technology

Supplying power transformers, substations, switchgear and electrical accessories for global distribution projects.

PRODUCTS

  • Transformers

  • Energy Storage Systems

  • Generators

navigation

  • HOME

  • PRODUCTS

  • ABOUT US

  • NEWS

  • FAQ

  • CONTACT

CONTACT US

Email

felix@jsdpower.com

Phone

+86 15312233527

WhatsApp

+86 15312233527

ADDRESS

Room 3705, No. 118 Qingyang Road, Liangxi District, Wuxi City
Copyright © 2026 Jinshida Electric Power Technology Co., Ltd.

Privacy Policy



+86 15312233527

+86 15312233527

felix@jsdpower.com


Get a Quote

Regardless of whether you require general advice or specific support, we are happy to help you.


Submit



Send Us Your Inquiry Today

logo

Jinshida Electric remains committed to contributing to global energy development through professional manufacturing and superior service.

Message