Product Description

Pole Mounted Single Phase Transformer overview

1.Low loss, energy saving,The maximum voltage is 36kV and the maximum capacity is 500KVA
2.Actual measurement is better than ANSI/IEEE and IEC standards, DOE2016, UL cUL CSA certification.
3.High efficiency and energy saving roll iron core structure design, use the pole hanging installation.
4.More than 50 countries and regions around the world run verification of high reliability.
5.It is mainly used in suburban distribution network, agricultural production and civil building power supply and distribution system
6.Executive standards: IEEE C57, ANSI C57, IEC76, GB10318


Pole Mounted Single Phase Transformer advantages
1.
High voltage copper wire winding technology to improve lightning resistance performance

2.Low voltage foil winding technology, high-quality A-E grade insulation material insulation

3.The material of the iron core is high-quality cold-rolled grain oriented silicon steel sheets with mineral oxide insulation

4.By controlling the process of cutting and stacking silicon steel sheets, the loss level, no-load current, and noise are minimized

Pole-Mounted Single-Phase Transformer Specifications

- Input Voltage: 34.5kV-19.92kV / 13.8kV-7.957kV / 13.2kV-7.62kV / 12.47kV-7.2kV

- Output Voltage: 120-240V / 240-480V / 347V / 600V, or others

- Capacity: 5kVA–500kVA (Max. voltage: 36kV; Max. capacity: 500kVA)

- Note: Voltage, capacity, frequency, connection group, and losses can be customized according to customer requirements.


Power (KVA)High Voltage (V)Low Voltage (V)Loss(W)Dimension (mm)
No-load LossOn-load LossWDH
5kva34500/ 19920 13800/ 7957 13200/ 7620 12470/ 7200 or others120-240 240-480 347 6001975465485855
10kva36120500525885
15kva50195520565905
25kva80290560590935
37.5kva105360610625935
50kva1355006356751035
75kva1906507458401035
100kva2108507709651135
167kva35014107958901335

FAQ

Q1、What are the key advantages of a CSP transformer?
Built-in protection (fuses, surge arrestors, and overload protection)  
Reduced maintenance due to self-protecting mechanisms  
Compact & lightweight, ideal for pole mounting  
Reliable performance in rural and urban power distribution


Q2、 What is the typical lifespan of a pole-mounted CSP transformer?  
With proper installation and maintenance, CSP transformers can last 20-30 years, depending on load conditions and environmental factors. 


Launch Your High-Efficiency Anti-Seepage Solution

Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.

WhatsApp

+86 15052176892
Send Inquiry