Products
Product Description
33kv Oil immersed Transformer Introduction
Against the backdrop of global electricity demand growth, 33kV three-phase oil immersed transformers are widely used in rural power grids, industry, commerce, new energy, public facilities, and other fields. High reliability operational verification in over 50 countries and regions worldwide; Already sold to countries and regions such asSouth Africa, Zimbabwe, Sudan, Kenya, Mozambique, Tanzania, Ethiopia, Nigeria, Namibia, Iraq, United Arab Emirates, Saudi Arabia
33kv Oil immersed Transformer Standards & Certification
1. Standards: GB, IEC, GOST, EN, NF, ANSI/IEEE (customizable according to customer standards)
2. Certification: ISO, CE, IEC, SABS, COC, CSA, UL
3. Efficiency: The efficiency of an 33kV three-phase oil immersed transformer can exceed 99%, which can meet the European 2015/2014/548/EC ecodesign Tier 2 energy efficiency regulations.
4. Maintenance free: IP65 protection level, dustproof and moisture-proof, maintenance free, designed for a lifespan of over 25 years.
5. Environmental protection and sustainable development: FR3 vegetable oil can be selected.
6. Overload capacity: Copper coil 33kv transformer allows short-term overload to 150% of rated capacity for no more than 2 hours, but requires monitoring of oil temperature (≤ 95 °C).
Technical Specifications for 33kV Oil-Immersed Transformer
- Input Voltage: 33 kV
- Output Voltage: 0.4 kV
- Capacity: 30–25,000 kVA
- Frequency: 50 Hz
- Voltage Regulation Method: Off-circuit tap changing (NLTC)
- Note: Voltage, capacity, frequency, vector group, on-load tap changing (OLTC), and no-load/load losses can be customized according to customer requirements.
FAQ
Q1、 What is an 33kV three-phase oil immersed transformer?
A three-phase oil immersed transformer is a power transformer that is cooled and insulated by insulating oil. It is designed for use in three-phase AC power systems and can convert high voltage electrical energy into low voltage (such as 33kV/400V). It is widely used in industrial, commercial, and power grid distribution.
Q2、What are the typical application scenarios ?
*Voltage conversion of urban distribution network (33kV → 400V);
*Power distribution in industrial plants such as mines and petrochemicals;
*Grid connection of renewable energy power plants (such as wind farms);
*Hospitals, data centers, and other places that require high reliability power supply.
Q3、What is the rated capacity range ?
The common capacity ranges from 25kVA to 10MVA, with the 100kVA to 2000kVA models of 33kV/400V being the most widely used, depending on the load requirements.
Q4、What are the key points to pay attention to when installing ?
-Stable foundation, horizontal installation, avoiding tilting;
-Reserve sufficient heat dissipation space (such as at least 1.5 meters away from the wall);
-Grounding resistance ≤ 4 Ω;
-Check the oil level, sealing, and cleanliness of the casing.
Launch Your High-Efficiency Anti-Seepage Solution
Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.
Related Products
Get a Quote
Regardless of whether you require general advice or specific support, we are happy to help you.
Send Us Your Inquiry Today

Jinshida Electric remains committed to contributing to global energy development through professional manufacturing and superior service.