Products
Product Description
15kv Oil immersed Transformer Introduction
Against the backdrop of global electricity demand growth, 15kV three-phase oil immersed transformers are widely used in rural power grids, industry, commerce, new energy, public facilities, and other fields. High reliability operational verification in over 50 countries and regions worldwide; Already sold to countries and regions such as Angola, Zambia, Uganda, Ethiopia, Rwanda, Mauritania,etc
15kv Oil immersed Transformer Standards & Certification
1. Standards: GB, IEC, GOST, EN, NF, ANSI/IEEE (customizable according to customer standards)
2. Certification: ISO, CE, IEC, SABS, COC, CSA, UL
3. Efficiency: The efficiency of an 15kV three-phase oil immersed transformer can exceed 99%, which can meet the European 2015/2014/548/EC ecodesign Tier 2 energy efficiency regulations.
4. Maintenance free: IP65 protection level, dustproof and moisture-proof, maintenance free, designed for a lifespan of over 25 years.
5. Environmental protection and sustainable development: FR3 vegetable oil can be selected.
6. Overload capacity: Copper coil 15kv transformer allows short-term overload to 150% of rated capacity for no more than 2 hours, but requires monitoring of oil temperature (≤ 95 °C).
15kv Oil immersed Transformer Type
For Jinshida Electric Power , a 15kv transformer can be a three-phase oil immersed transformer, a column mounted three-phase oil immersed transformer, or a three-phase pad mounted transformer. These types of transformers have the same principle, but their structures are different, and different types of transformers have different applications. Jinshida Electric Power provides you with the most ideal solution.
15kV three-phase oil immersed transformer (rated voltage 6kV-35kV)
Install a three-phase oil immersed transformer (rated voltage 2.4kv-34.5kv) on an 15kV column
15kV three-phase pad mounted transformer (rated voltage 2.4kv-34.5kv)
15kv Oil immersed Transformer Technical Specifications
- Input voltage: 15kV
- Output voltage: 0.4kv 0.415kv 0.420kv
- Capacity: 30-5000 kva
- Frequency: 50 hz
- Remark: voltage, capacity, frequency, connection group and loss can be customized according to customer requirements
FAQ
Q1、What is an 15kV three-phase oil immersed transformer?
A three-phase oil immersed transformer is a power transformer that is cooled and insulated by insulating oil. It is designed for use in three-phase AC power systems and can convert high voltage electrical energy into low voltage (such as 15kV/400V). It is widely used in industrial, commercial, and power grid distribution.
Q2、What are the typical application scenarios?
*Voltage conversion of urban distribution network (15kV → 400V);
*Power distribution in industrial plants such as mines and petrochemicals;
*Grid connection of renewable energy power plants (such as wind farms);
*Hospitals, data centers, and other places that require high reliability power supply.
Q3、What is the rated capacity range?
The common capacity ranges from 25kVA to 10MVA, with the 100kVA to 2000kVA models of 15kV/400V being the most widely used, depending on the load requirements.
Q4、What are the key points to pay attention to when installing?
-Stable foundation, horizontal installation, avoiding tilting;
-Reserve sufficient heat dissipation space (such as at least 1.5 meters away from the wall);
-Grounding resistance ≤ 4 Ω;
-Check the oil level, sealing, and cleanliness of the casing.
Launch Your High-Efficiency Anti-Seepage Solution
Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.
Related Products
Get a Quote
Regardless of whether you require general advice or specific support, we are happy to help you.
Send Us Your Inquiry Today

Jinshida Electric remains committed to contributing to global energy development through professional manufacturing and superior service.