Products
Product Description
13.8 KV Distribution Transformer overview
1.Product actual measurement is better than GB and IEC standards
2.More than 50 countries and regions around the world run verification of high reliability
3.It is mainly used in 13.8KV distribution network, power supply and distribution system of industrial and mining enterprises and civil buildings
4.Products are mainly sold to Saudi Arabia, UAE etc.
5.Executive standard: IEC 60076 series, IEC 6013, IEC 60214-1, IEC 60296;GB1094 series, GB/T6451-2015, GB/T7597-2007, etc
13.8 KV Distribution Transformer advantage
1.High voltage copper wire winding technology to improve lightning resistance performance
2.Low voltage foil winding technology, high-quality A-E grade insulation material insulation
3.Low magnetic leakage, high mechanical strength, and strong short-circuit resistance
4.The material of the iron core is high-quality cold-rolled grain oriented silicon steel sheets with mineral oxide insulation
5.By controlling the process of cutting and stacking silicon steel sheets, the loss level, no-load current, and noise are minimized
6.Authoritative certification: ISO9001, CE, CCC, COC, UL, CSA, etc
7.Perfect SQA quality management system and patented technology to ensure high quality products
8.Efficient production equipment and low raw material prices to ensure the price advantage
9.Sufficient inventory, short delivery time and fast delivery worldwide - Perfect after-sales service system, allowing customers to buy worry-free
13.8 KV Distribution Transformer parameters
- Input voltage: 13.8kV
- Output voltage: 0.4kv 0.416 kv 0.420kv 0.440kv 0.480kv
- Capacity: 30-2500 kva
- Frequency: 50/60 HZ
- Remark: voltage, capacity, frequency, connection group and loss can be customized according to customer requirements
FAQ
Q1: What is the primary voltage rating of this transformer?
A:The primary voltage rating is 13.8 kV.
Q2: What are the common secondary voltage options?
A:Common secondary voltages include 240V, 480V, and 4160V, depending on the application.
Q3:What standards does this transformer comply with?
A:It meets IEEE, ANSI, and IEC standards for safety and performance.
Launch Your High-Efficiency Anti-Seepage Solution
Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.
Related Products
Get a Quote
Regardless of whether you require general advice or specific support, we are happy to help you.
Send Us Your Inquiry Today

Jinshida Electric remains committed to contributing to global energy development through professional manufacturing and superior service.