logo
  • HOME

  • PRODUCTS

    Transformers
    • Oil-Immersed Transformers

    • Dry-Type Transformers

    • Compact Substations

    • Special Transformers

    Energy Storage Systems
    • Mobile Energy Storage Systems

    • Container Energy Storage Systems

    • Commercial & Industrial Energy Storage Systems

    • Residential Energy Storage Systems

    Generators
    • Silent Canopy Diesel Generator Sets

    • Open Type Diesel Generator Sets

  • ABOUT US

  • NEWS

  • FAQ

  • CONTACT


EnglishEnglish


русскийрусскийالعربيةالعربيةFrançaisFrançaisPortuguêsPortuguêsEspañolEspañol
Send Inquiry
  • PRODUCTS

    HOME / PRODUCTS


Products

  • Transformers

    
    • Oil-Immersed Transformers

    • Dry-Type Transformers

    • Compact Substations

    • Special Transformers

  • Energy Storage Systems

    
    • Mobile Energy Storage Systems

    • Container Energy Storage Systems

    • Commercial & Industrial Energy Storage Systems

    • Residential Energy Storage Systems

  • Generators

    
    • Silent Canopy Diesel Generator Sets

    • Open Type Diesel Generator Sets



WhatsApp

+86 15312233527


Email

felix@jsdpower.com


Address

Room 3705, No. 118 Qingyang Road, Liangxi District, Wuxi City
  • 500kW/1MWh Air Cooling Container Energy Storage System
    500kW/1MWh Air Cooling Container Energy Storage System
    The 500kW/1MWh Air Cooling Container Energy Storage System utilizes high-quality LiFePO4 batteries and integrates the battery system, PCS, Battery Management System (BMS), Energy Management System (EMS), and fire protection system into a standard 20-foot container.
    Learn More
  • 1MW/2MWh Liquid Cooling Container Energy Storage System
    1MW/2MWh Liquid Cooling Container Energy Storage System
    The 1MW/2MWh Liquid Cooling Container Energy Storage System adopts a standard 20-foot container design, integrating the battery system, liquid cooling system, Battery Management System (BMS), Energy Management System (EMS), fire protection system, and monitoring platform into a single intelligent solution.
    Learn More
  • 51.2V Wall-mounted LiFePO4 Energy Storage Battery
    51.2V Wall-mounted LiFePO4 Energy Storage Battery
    The 51.2V Wall-mounted LiFePO4 Energy Storage Battery adopts premium lithium iron phosphate (LiFePO4) cells and an intelligent Battery Management System (BMS), providing high safety, long cycle life, and excellent energy efficiency. It is specially designed for residential energy storage systems, solar photovoltaic applications, and backup power solutions.
    Learn More
  • 51.2V Stackable LiFePO4 Energy Storage Battery
    51.2V Stackable LiFePO4 Energy Storage Battery
    The 51.2V Stackable LiFePO4 Energy Storage Battery features a modular design that allows flexible capacity expansion and easy installation. It is widely used in residential energy storage systems, solar power storage, off-grid applications, and commercial energy storage projects.
    Learn More
  • Mining Flameproof Transformer
    Mining Flameproof Transformer
    Designed for mine power distribution, this oil-immersed transformer features a compact size, ease of transport into the mine, a rational structure, low losses, and excellent thermal conductivity.
    - Suitable for oil-immersed mine power transformers with capacities up to 1250 kVA and voltages up to 10 kV. This is a standard oil-immersed transformer without explosion-proof requirements, primarily serving as a power source for mine lighting or electric drive systems during distribution.
    - Proven high reliability through operation in over 50 countries and regions worldwide; key markets include Iran, Kazakhstan, Uzbekistan, Pakistan, Indonesia, and Chile.
    - Standards compliance: IEC 60076, GB 1094.1–2-1996, GB 1094.3,5-2003, GB/T 6451-2008, and GB 12173-2008.
    Learn More
  • European-Type Compact Substation
    European-Type Compact Substation
    Brand: JINSHIDA
    Series: YBW
    Uses: Distribution solutions
    Country of Origin: China
    Certifications: ISO9001, CB, CE
    Learn More
  • <Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • Next>

Jinshida Electric Power Technology

Supplying power transformers, substations, switchgear and electrical accessories for global distribution projects.

PRODUCTS

  • Transformers

  • Energy Storage Systems

  • Generators

navigation

  • HOME

  • PRODUCTS

  • ABOUT US

  • NEWS

  • FAQ

  • CONTACT

CONTACT US

Email

felix@jsdpower.com

Phone

+86 15312233527

WhatsApp

+86 15312233527

ADDRESS

Room 3705, No. 118 Qingyang Road, Liangxi District, Wuxi City
Copyright © 2026 Jinshida Electric Power Technology Co., Ltd.

Privacy Policy



+86 15312233527

+86 15312233527

felix@jsdpower.com


Get a Quote

Regardless of whether you require general advice or specific support, we are happy to help you.


Submit



Send Us Your Inquiry Today

logo

Jinshida Electric remains committed to contributing to global energy development through professional manufacturing and superior service.

Message