‹

1MW/2MWh Liquid Cooling Container Energy Storage System

›

‹

›

1MW/2MWh Liquid Cooling Container Energy Storage System
The 1MW/2MWh Liquid Cooling Container Energy Storage System adopts a standard 20-foot container design, integrating the battery system, liquid cooling system, Battery Management System (BMS), Energy Management System (EMS), fire protection system, and monitoring platform into a single intelligent solution.
WhatsApp : +86 15312233527
Email : felix@jsdpower.com
Phone : +86 15312233527
View Quote >

Product Description

1MW/2MWh Liquid Cooling Container Energy Storage System

The advanced liquid cooling technology effectively controls battery temperature, improves system efficiency, extends battery life, and enhances operational safety. Compared with conventional air-cooled systems, it offers higher energy density, lower energy consumption, and better thermal performance.

The system supports remote monitoring, cloud-based management, and parallel expansion, making it ideal for utility-scale photovoltaic plants, wind farms, grid-side energy storage, industrial parks, microgrids, and large-scale renewable energy projects.

Features

• Standard 20-foot container design

• 2MWh energy storage capacity

• 1MW rated output power

• High-safety LiFePO4 battery technology

• Advanced liquid cooling system

• Cell temperature difference ≤3°C

• More than 8,000 life cycles

• Integrated BMS and EMS platform

• Multi-level fire protection system

• Remote monitoring and cloud-based operation

• Supports parallel expansion

• Designed for utility-scale energy storage projects

• Lower operating costs and higher system efficiency

• Ideal for renewable energy integration and grid applications

Technical Specifications

ItemSpecification
Description1MW/2MWh Liquid Cooling Container Energy Storage System
Product Name1MW/2MWh Liquid Cooling Container Energy Storage System
Product TypeLiquid-cooled Battery Energy Storage System (BESS)
Rated Power1000kW (1MW)
Rated Capacity2000kWh (2MWh)
Battery TypeLiFePO4
Battery Cell280Ah / 314Ah (Optional)
DC Voltage1000V–1500V DC
Frequency50Hz / 60Hz
Cooling MethodIntelligent Liquid Cooling
Fire ProtectionAerosol + Novec Fire Suppression System
Thermal ManagementIntelligent Liquid Cooling
Protection RatingIP54 / IP55
Communication ProtocolModbus / CAN / RS485 / Ethernet
Operating Temperature-30°C to +55°C
Altitude≤4000m
InstallationStandard 20ft Container
Cycle Life≥8000 Cycles (80% DOD)
Parallel ExpansionSupported
CertificationsIEC62619, IEC62933, UN38.3, CE (Optional)

FAQ

Launch Your High-Efficiency Anti-Seepage Solution

Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.

WhatsApp

+86 15312233527
Send Inquiry