logo
  • HOME

  • PRODUCTS

    Transformers
    • Oil-Immersed Transformers

    • Dry-Type Transformers

    • Compact Substations

    • Special Transformers

    Energy Storage Systems
    • Mobile Energy Storage Systems

    • Container Energy Storage Systems

    • Commercial & Industrial Energy Storage Systems

    • Residential Energy Storage Systems

    Generators
    • Silent Canopy Diesel Generator Sets

    • Open Type Diesel Generator Sets

  • ABOUT US

  • NEWS

  • FAQ

  • CONTACT


EnglishEnglish


русскийрусскийالعربيةالعربيةFrançaisFrançaisPortuguêsPortuguêsEspañolEspañol
Send Inquiry
  • 展示图商业一体储能柜1
    125kW/261kWh Commercial & Industrial Energy Storage System
    The 125kW/261kWh Commercial & Industrial Energy Storage System integrates the battery system, Battery Management System (BMS), Power Conversion System (PCS), Energy Management System (EMS), temperature control system, and fire protection system into one compact unit, providing a safe, efficient, and intelligent energy storage solution for commercial and industrial users.
  • 展示图移动式小型拖车储能1
    50kW/100kWh Portable Trailer Energy Storage System
    The 50kW/100kWh Portable Trailer Energy Storage System is a compact and lightweight mobile energy storage solution designed for temporary and small-scale power supply applications. Its portable structure allows convenient transportation, quick deployment, and simple operation in various outdoor environments.
  • 展示图移动式拖车储能1
    100kW/215kWh Mobile Trailer Energy Storage System
    The 100kW/215kWh Mobile Trailer Energy Storage System features a trailer-mounted design for rapid deployment and easy transportation. The integrated system includes LiFePO4 batteries, an inverter, intelligent monitoring, and fire protection, delivering reliable mobile power wherever it is needed.
  • 展示图20寸风冷集装箱1
    500kW/1MWh Air Cooling Container Energy Storage System
    The 500kW/1MWh Air Cooling Container Energy Storage System utilizes high-quality LiFePO4 batteries and integrates the battery system, PCS, Battery Management System (BMS), Energy Management System (EMS), and fire protection system into a standard 20-foot container.

Jinshida Electric Power Technology

Supplying power transformers, substations, switchgear and electrical accessories for global distribution projects.

PRODUCTS

  • Transformers

  • Energy Storage Systems

  • Generators

navigation

  • HOME

  • PRODUCTS

  • ABOUT US

  • NEWS

  • FAQ

  • CONTACT

CONTACT US

Email

felix@jsdpower.com

Phone

+86 15312233527

WhatsApp

+86 15312233527

ADDRESS

Room 3705, No. 118 Qingyang Road, Liangxi District, Wuxi City
Copyright © 2026 Jinshida Electric Power Technology Co., Ltd.

Privacy Policy



+86 15312233527

+86 15312233527

felix@jsdpower.com


Get a Quote

Regardless of whether you require general advice or specific support, we are happy to help you.


Submit



Send Us Your Inquiry Today

logo

Jinshida Electric remains committed to contributing to global energy development through professional manufacturing and superior service.

Message