‹

125kW/261kWh Commercial & Industrial Energy Storage System

›

‹

›

125kW/261kWh Commercial & Industrial Energy Storage System
The 125kW/261kWh Commercial & Industrial Energy Storage System integrates the battery system, Battery Management System (BMS), Power Conversion System (PCS), Energy Management System (EMS), temperature control system, and fire protection system into one compact unit, providing a safe, efficient, and intelligent energy storage solution for commercial and industrial users.
WhatsApp : +86 15312233527
Email : felix@jsdpower.com
Phone : +86 15312233527
View Quote >

Product Description

125kW/261kWh Commercial & Industrial Energy Storage System

Equipped with high-performance LiFePO4 batteries, the system delivers excellent safety, long service life, and high energy efficiency. It helps reduce electricity costs through peak shaving, demand management, backup power supply, and renewable energy integration.

Its modular design supports parallel expansion and is widely used in industrial parks, manufacturing facilities, commercial buildings, EV charging stations, data centers, and renewable energy storage projects.

Features

• Highly integrated PCS, BMS, and EMS

• 125kW rated output power

• 261kWh energy storage capacity

• Premium Grade-A LiFePO4 battery cells

• Over 6,000 cycle life

• Intelligent temperature control system

• Built-in automatic fire protection system

• Remote monitoring and cloud platform management

• Peak shaving and load shifting capability

• Supports parallel system expansion

• Outdoor-rated enclosure for harsh environments

• Easy installation and low maintenance costs

Technical Specifications

ItemSpecification
Description125kW/261kWh Commercial & Industrial Energy Storage System
Product Name125kW/261kWh Commercial & Industrial Energy Storage System
Product TypeOutdoor All-in-one Energy Storage Cabinet
Battery TypeLiFePO4
Rated Power125kW
Rated Capacity261kWh
Battery Voltage768V
Battery Capacity340Ah
Cycle Life≥6000 Cycles (80% DOD)
AC Output Voltage380V / 400V
Output Frequency50Hz / 60Hz
Protection RatingIP54
Cooling MethodIntelligent Air Cooling
Fire ProtectionAutomatic Fire Suppression System
CommunicationRS485 / CAN / Ethernet
Operating Temperature-20°C to +55°C
InstallationOutdoor Floor-mounted
Parallel ExpansionSupported
CertificationsCE, UN38.3, IEC62619 (Optional)

FAQ

Launch Your High-Efficiency Anti-Seepage Solution

Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.

WhatsApp

+86 15312233527
Send Inquiry