‹

100kW/215kWh Mobile Trailer Energy Storage System

›

‹

›

100kW/215kWh Mobile Trailer Energy Storage System
The 100kW/215kWh Mobile Trailer Energy Storage System features a trailer-mounted design for rapid deployment and easy transportation. The integrated system includes LiFePO4 batteries, an inverter, intelligent monitoring, and fire protection, delivering reliable mobile power wherever it is needed.
WhatsApp : +86 15312233527
Email : felix@jsdpower.com
Phone : +86 15312233527
View Quote >

Product Description

100kW/215kWh Mobile Trailer Energy Storage System

Supporting charging from the utility grid, photovoltaic systems, and diesel generators, the system is suitable for emergency power supply, disaster relief, outdoor construction, communication base stations, temporary events, and off-grid applications, providing flexible and dependable mobile energy solutions.

Features

• Trailer-mounted mobile design

• Rapid deployment capability

• Supports grid charging

• Supports photovoltaic charging

• Supports diesel generator charging

• Long-life LiFePO4 battery system

• Intelligent monitoring and control

• Automatic fire protection system

• Suitable for demanding environments

• Easy transportation and mobility

Technical Specifications

ItemSpecification
Description100kW/215kWh Mobile Trailer Energy Storage System
Product Name100kW/215kWh Mobile Trailer Energy Storage System
Rated Power100kW
Rated Capacity215kWh
Battery TypeLiFePO4
Nominal Battery Voltage768V DC
DC Voltage Range672V–876V DC
Cycle Life≥6000 Cycles (80% DOD)
Charge/Discharge Rate0.5C
AC Output Voltage400V AC
Frequency50Hz / 60Hz
PCS Capacity100kW
Inverter Efficiency≥98%
Cooling MethodIntelligent Air Cooling
Battery Management SystemBMS
Energy Management SystemEMS
Communication ProtocolCAN / RS485 / Modbus TCP
Protection RatingIP54
Operating Temperature-20°C to +55°C
Fire ProtectionAutomatic Fire Suppression System
Charging MethodGrid / Solar PV / Diesel Generator
MobilityTrailer-mounted
TiresHighway Trailer Tires
Max. Towing Speed≤80km/h
Parallel OperationSupported

FAQ

Launch Your High-Efficiency Anti-Seepage Solution

Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.

WhatsApp

+86 15312233527
Send Inquiry