Product Description

The Mobile Substation is a highly integrated and transportable power distribution solution designed for rapid deployment in temporary and emergency power supply applications. Featuring a compact structure, convenient transportation, and quick installation, it provides reliable and efficient power distribution for construction sites, mining operations, emergency power restoration, infrastructure projects, and temporary electrical installations.

Product Features


• Rapid deployment


• Ideal for temporary power supply applications


• Flexible mobility


• Easy transportation and on-site relocation


• Highly integrated design


• Reduces on-site installation time


• Safe and reliable operation


• Ensures continuous and stable power supply


• Wide range of applications


• Suitable for emergency power and construction projects


Technical Specifications


ItemSpecification
Product ModelMobile Substation
Product TypeMobile Temporary Package Substation
Rated Capacity500kVA–1250kVA
Popular Ratings500kVA, 630kVA, 800kVA, 1000kVA, 1250kVA
High Voltage10kV / 11kV / 20kV / 33kV / 35kV
Low Voltage0.4kV
Frequency50Hz / 60Hz
PhaseThree Phase
Cooling MethodONAN
Mobility TypeTrailer-mounted or Skid-mounted
Protection RatingIP33
InstallationOutdoor
StandardsIEC 62271, GB/T 17467


FAQ

Q1: What is a mobile box-type substation?

A: A mobile box-type substation is a mobile power unit that integrates a transformer, high- and low-voltage switchgear, protection devices, and control systems. It can be rapidly transported and deployed, providing a reliable power solution for temporary and emergency electricity needs.

Q2: In what scenarios are mobile box-type substations primarily used?

A: These products are widely used in construction, mining, emergency power repairs, new energy projects, temporary engineering works, large-scale events, and other applications requiring rapid power supply.

Q3: What advantages do mobile box-type substations offer compared to traditional substations?

A: Mobile box-type substations offer advantages such as short installation cycles, convenient transport, minimal on-site construction, and flexible deployment, enabling them to rapidly meet temporary and emergency power supply needs across various scenarios.

Q4: What capacity specifications are available for mobile box-type substations?

A: Standard capacities include 500kVA, 630kVA, 800kVA, 1000kVA, and 1250kVA; customized capacity solutions can also be provided based on specific project requirements.

Q5: What voltage levels do mobile box-type substations support?

A: They support high-voltage input levels such as 10kV, 11kV, 20kV, 33kV, and 35kV, with a typical low-voltage output of 0.4kV; designs can be tailored to meet specific grid requirements.

Q6: How are mobile box-type substations transported and installed?

A: They feature a trailer-mounted or skid-mounted design, allowing for rapid transport to the designated site by vehicle; this minimizes on-site installation work and enables quick commissioning.

Q7: Can mobile box-type substations operate for extended periods?

A: Yes. They utilize highly reliable electrical components and an outdoor-rated protective design, offering excellent environmental adaptability to meet long-term, continuous operation requirements.

Q8: Can mobile box-type substations be customized?

A: Yes. Transformer capacity, voltage levels, high/low-voltage configurations, protection functions, structural design, and mobility methods can all be customized to meet the specific application requirements of different projects.

Launch Your High-Efficiency Anti-Seepage Solution

Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.

WhatsApp

+86 15312233527
Send Inquiry