‹

Silent Canopy Diesel Generator Set

›

‹

›

Silent Canopy Diesel Generator Set
The Silent Canopy Diesel Generator Set features a weatherproof and soundproof enclosure that significantly reduces operating noise while protecting the equipment from harsh outdoor environments. With stable performance, low fuel consumption, and reliable power output, it is an ideal solution for hospitals, hotels, schools, office buildings, residential communities, communication stations, and other locations where low-noise operation is essential.
WhatsApp : +86 15312233527
Email : felix@jsdpower.com
Phone : +86 15312233527
View Quote >

Product Description


Features

Silent Canopy Diesel Generator Set

• Low-noise operation

• Weatherproof and dustproof design

• Suitable for outdoor installation

• High-quality engine configuration

• Intelligent control system

• Energy-efficient and environmentally friendly

• Continuous operation capability

• Easy maintenance

• Stable and reliable performance

• Ideal for noise-sensitive environments

Technical Specifications

ItemSpecification
DescriptionSilent Canopy Diesel Generator Set
Product NameSilent Canopy Diesel Generator Set
Prime Power50kVA–500kVA
Standby Power55kVA–550kVA
Frequency50Hz / 60Hz
Rated Voltage230V / 400V
Rated Speed1500rpm / 1800rpm
Power Factor0.8
Output TypeThree-phase, Four-wire
Excitation SystemBrushless Self-excited
Starting System24V DC Electric Start
Cooling MethodEnclosed Water Cooling
Fuel TypeDiesel
Noise Level65–75dB (at 7m)
Canopy MaterialPowder-coated Galvanized Steel
Protection RatingIP54
ControllerIntelligent LCD Controller
ATSOptional
Remote MonitoringOptional
Continuous Running Time≥8 Hours
Ambient Temperature-20°C to +55°C
Altitude≤1000m

FAQ

Launch Your High-Efficiency Anti-Seepage Solution

Our team of experts will provide you with a customized quotation and technical recommendations within 24 hours.

WhatsApp

+86 15312233527
Send Inquiry